Header 2008

 

 SEC is one of the
 leading companies 
dealing in second-hand industrial plants and plant components in Switzerland.
 High quality products,
 competent consultation
 and efficient services
guarantee the professional
care of our customers.
 
  Contact:
  SEC AG
  Hauptstr.2
  4402 Frenkendorf
  Switzerland 

  tel. +41 61 903 90 08
  fax +41 61 903 90 06
  e-mail: info@sec-ag.ch

  Please find more 
  information on our 
  products at 
www.sec-ag.ch .

 

 

For Sale

Used Power Plant 42 MW

Oil / gas high pressure steam boiler and
steam turbine with electrical generator

In 1975 this plant was taken into operation for the first time, consisting of
a high pressure steam boiler and a counter pressure steam turbine with electrical generator. In the following years it was only operated for very
short periods, with an overall running time of approximately 30'000 hours.

The power plant, built with the currently highest industrial high pressure
steam boiler in Switzerland, consists of highly valuable components.
All elements have been carefully dismantled by specialists and are currently stored in a warehouse.

In case of interest all the components can be viewed, you can
contact us during office hours to arrange an appointment.

High pressure steam boiler
  • Manufacturer: Wehrle Werke,
    Emmendingen, Germany
  • Year of construction: 1974
  • Steam production: 160 tons/hour

The boiler can be fired with light oil
or natural gas, conform to clean air
regulations.

 

Steam turbine
  • Manufacturer: BBC, Baden, Switzerland
  • Year of construction: 1974
  • Steam throughput: 150 tons/hour

This turbine with a high, medium and low pressure part is operated on a counter pressure system.

Electrical generator
  • Manufacturer: Maschinenfabrik
    Oerlikon, Switzerland
  • Year of construction: 1974
  • Power: 55 kVA
During only 30'000 hours of operation time this generator ran trouble-free and is still in extraordinarily good condition.


The dismantling
procedure

All the plant's main components were dismantled and will be revised and temporarily stored in a warehouse.

The steam turbine and the electrical generator were dismantled first: in a spectacular effort taking several hours, the generator's
85 tons in weight were loaded with special lifting gear onto a
heavy vehicle truck.

As a further step the high pressure steam boiler had to be
dismantled.

The steam boiler with more than 400 tons of weight, consisting of
a complex piping system and various additional equipment, had
been removed of insulation and was taken apart into big, still transportable pieces. The heavy dismantled elements were
lifted out of the building through a specially constructed roof opening by using a 500 ton heavy weight crane, and then loaded onto a heavy vehicle truck for transportation.





Dismantled, lifted,
and loaded for transportation.



Would you like some more information on this plant?

Please don't hesitate to call sec swiss engineering contact ag and ask for
our free brochure at +41 61 903 90 08 or send us an e-mail to info@sec-ag.ch.

For any further questions our friendly and competent staff will be pleased to help.